Fx Cargo Ops · Load planning

Air Cargo Load Planning Software

Plan the load before the flight is released.

Build aircraft-specific cargo load plans with piece, weight, volume, dimension and compartment information. FlightStratix evaluates the configured limits, records plan revisions and connects load readiness to the cargo flight's dispatch checks.

LOAD PLAN
Flight CX-402 · B747F
In planning
Planned payload
68.4tof 92t max
Fwd cargo (max 28t)22.6t allocated
Aft cargo (max 38t)31.8t allocated
Bulk hold (max 8t)6.2t allocated
DG items2 declared · NOTOC rev 3
3 checks PASS · 0 FAIL · Finalise available
The challenge

Load information cannot live in a disconnected worksheet

Flight operations needs to know which plan is current, what changed and whether cargo constraints have been checked. The plan should stay linked to the operating flight and shipment allocations.

Capabilities

Built around the way you work

Each capability is part of the connected FlightStratix workspace.

Aircraft cargo configurations

Set effective-dated aircraft configurations with maximum payload, volume, compartment dimensions, door limits and permitted cargo attributes using operator-supplied approved data.

Build the flight load plan

Add cargo items with piece count, weights, volumes, dimensions and compartment assignment, including eligible shipment-linked allocations.

Review checks and revisions

Inspect plan findings; finalisation requires a nonempty plan with no FAIL or UNKNOWN check result. Reopen a final plan with a reason.

Record what was actually loaded

Capture loaded weight and offloaded items after planning, keeping a history of the operational change.

How it works

From start to finish

1
Select configuration
Choose aircraft type and limits
2
Add cargo
Assign pieces to compartments
3
Evaluate checks
Review weight/volume limits
4
Finalise plan
Lock the approved load
5
Record actuals
Capture loaded and offloaded items
6
Review readiness
Check against dispatch release
How it works in detail

Cargo aircraft configuration, load checks and actual uplift

Load decisions need current aircraft limits, actual pieces and a versioned plannot a separate spreadsheet.

Use a configured aircraft loading profile

Define effective-dated aircraft cargo configurations with maximum payload and volume, compartments, door dimensions, maximum piece length and dangerous-goods permissions. These values come from the operator's supplied approved data and must be maintained accurately.

Build a load from eligible cargo items

Select an aircraft configuration for the cargo flight, add eligible pieces with planned compartment, weight and volume, and keep shipment-linked allocations connected to their source shipment record.

Checks that distinguish unknown from cleared

Review plan evaluations before finalising. Empty plans and checks returning FAIL or UNKNOWN cannot be finalised as if safe. Revisions carry expected version checks, and staff may reopen a final plan with a reason.

Record actual load and offloads

After planning, enter actual loaded weight or record offloaded items. The dispatch release service checks cargo-plan status and current evaluation, helping stop an incomplete plan from being mistaken for a released flight.

Under the hood

Plan the load against actual aircraft constraints

Start with an operator-maintained configuration

Each aircraft cargo configuration can have effective dates, reference details, maximum total payload and total volume. Compartments record weight and volume limits, door width and height, maximum piece length and whether dangerous goods are permitted. These are operational inputs maintained by the operator; the application does not certify that they match the aircraft's approved loading manual. A clear load-planning page should make that responsibility visible rather than implying that any entered value is automatically approved.

A load item has real dimensional requirements

The flight plan holds load items with number of pieces, weight, volume, dimensions and planned compartment. These details answer more than 'how many tonnes are on board': a piece may fit within total payload but not through a compartment door, or it may be unsuitable for a location based on its handling classification. The system evaluates planned items against the saved configuration and returns checks that the load planner needs to review.

Missing data must not look like spare capacity

The finalisation workflow requires a nonempty plan and does not accept FAIL or UNKNOWN results. That distinction is useful in operations where incomplete shipment dimensions or a missing configuration might otherwise look like zero additional load. The plan also uses expected revisions to stop stale updates from overwriting later work, and it records a reason for reopening a final plan.

After loading, keep planned and actual weight separate

When a plan is finalised, actual loaded weight can be recorded for relevant items, or items can be marked offloaded. Shipment-linked items should be changed through the cargo shipment workflow so the booking and allocation records remain aligned. A changed load can affect NOTOC currency and flight dispatch readiness. The load page should link to shipment management and Cargo Ops rather than attempting to own their wider search terms.

Cargo readiness contributes to flight release

For a cargo flight, dispatch release checks require a suitable cargo plan and passing cargo checks in addition to the configured aircraft, crew and station conditions. A plan finalised earlier cannot be assumed current after material cargo amendments. This is an operational cross-check, not a claim that the software independently replaces authorised load control, weighing equipment or aircraft manufacturer's approved documentation.

Operational detail

Review the planned load against its source data.

Keep the shipment allocation visible

Review which shipments are assigned to the flight and the loading information associated with them. Keep changes connected to their source records so the team can understand what has changed before preparing the next plan.

Explore cargo shipment records

Use validated aircraft and loading information

The planning workflow depends on the aircraft and loading data entered by the team. Review the plan under your approved operating procedures and keep the resulting operational events connected to the shipment history.

Connect shipment event tracking
Example workflowCargo Load Planning
  1. Select configurationChoose aircraft type and limits
    Complete
  2. Add cargoAssign pieces to compartments
    Complete
  3. 03
    Evaluate checksReview weight/volume limits
    In review
  4. 04
    Finalise planLock the approved load
    Pending
  5. 05
    Record actualsCapture loaded and offloaded items
    Pending
  6. 06
    Review readinessCheck against dispatch release
    Pending
Real-world scenarios

See it in context

Scenario

Load checks find an unsuitable compartment

A large piece is proposed for a compartment with insufficient door clearance. The planner reviews the check result, moves the piece to an eligible location or removes it from the planned flight and evaluates again. After finalisation, the team records actual weight and any offloaded items. If dangerous goods are affected, the NOTOC is reviewed and updated as required before the release is accepted.

Operational example

An operational example

A flight receives several pieces for two compartments. The load planner selects the applicable aircraft configuration, allocates pieces and reviews a weight-volume conflict. The plan remains unfinalised until corrected; after loading, actual weights and offloads are recorded before dispatch release is reviewed.

Records and handoffs

Aircraft configuration → flight load items → limits check → revision → final plan → actual loaded.

Scope

Prepare load-planning records using validated aircraft and loading information. Approved load-control and weight-and-balance procedures remain authoritative for flight release.

Frequently Asked Questions

Does the system supply aircraft-approved loading limits?

The operator enters the applicable data; approval of that data is not established by the product reference.

Can an incomplete plan be finalised?

The documented service blocks empty plans and checks marked FAIL or UNKNOWN.

Can I finalise a plan with missing weight information?

No. The documented finalisation rules reject unknown or failing checks and empty plans.

Can a released plan be changed?

It can be reopened with a reason and maintained as a revised plan; any affected operational release must be reviewed under the airline/cargo rules.

Keep exploring

Explore FlightStratix solutions

Ready when you are

Keep cargo load readiness part of flight readiness.Book an Fx Cargo Ops demo.

Book a 30-minute walkthrough tailored to your operation.

30-day free trial · Provisioned within 24 hours · Cancel anytime