Every defect tracked. Every deferral timed.

Aircraft maintenance tracking software with CAMO and MEL built in. TAH, TAC, component life and scheduled events on one record. Category A MELs block dispatch automatically not with a warning banner, with a hard stop. Works with aircraft scheduling and dispatch.

TAH / TAC per component MEL Categories A – D Cat A blocks dispatch
app.flightstratix.com/fleet/N28FS/mel
MEL log · N28FS Citation X
3 open · 1 blocking
ATADescriptionCatDueStatus
28-22Fuel quantity indicator tank 2ANext flightOpen
21-51Pack valve position indicationC28 May 26Deferred
34-11Weather radar tilt indicatorD14 Sep 26Deferred
ATA 28-22 blocks dispatch · Category A, rectify before next flight
Dispatch blocked
TS-2842 · N28FS held
Feasibility engine · MEL Cat A open
CAMO warning
Engine hot section · 42h to due
Component TAH 3,258 / 3,300

Full CAMO tracking. Nothing bolted on.

Maintenance and MEL aren't a separate system. They're the same record as the trip that's about to fly with them.

TAH & TAC

Aircraft and component hour tracking

Total Aircraft Hours and Total Aircraft Cycles at fleet, aircraft and component level. Journey log entries roll straight into cumulative totals.

Rolls up fromJourney Log
Scheduled maintenance

Due dates and intervals per event

Configure scheduled maintenance events with due dates and repetition intervals. 30-day warning, 7-day critical, surfaced on the notification bell.

Alerts30d · 7d
Component life

Per-component TAH, TAC and CAM limits

Every tracked component with its own hours, cycles and Continued Airworthiness Management limits. Progress bars turn amber then red as limits approach.

ModelCAM · TAH · TAC
MEL categories

A, B, C, D with auto-calculated due dates

Category A: rectify before next flight. B: 3 calendar days. C: 10. D: 120. The system tracks the clock so nobody has to remember which category means what.

RectificationA · B · C · D
Dispatch blocking

Category A MELs block trips, not warn

Category A and overdue items enforced through the Feasibility Engine. The trip can't be published until it's rectified or the deferral is legally valid.

Enforced atTrip publish
CAMO warnings

Maintenance events on the feasibility check

Every trip pre-check surfaces CAMO warnings alongside FTL and MEL the whole airworthiness picture in one panel, before crew gets rostered.

Surfaced withFTL · MEL

Hours, cycles and components on one record.

Every aircraft carries its Total Aircraft Hours, Total Aircraft Cycles and a full Continued Airworthiness Management model. Each tracked component has its own limits and its own progress bar. When the numbers roll in from journey logs, the totals move automatically.

Aircraft-level TAH and TAC updated from every journey log entry, no manual reconciliation.
Per-component tracking engines, APUs, landing gear, life-limited parts each with its own hours and cycles.
CAM limits enforced with amber-then-red progress bars so nothing hits its limit unnoticed.
Scheduled maintenance events with due dates, intervals and 30-day / 7-day alerts on the notification bell.
30d
Warning window
7d
Critical alert

Aircraft · N12FS · G650

app.flightstratix.com/fleet/N12FS/mx
Airworthiness · TAH / TAC
6 components · 2 approaching
TAH
14,282.4h
TAC
6,481
Engine #1 hot section3,258 / 3,300h
Engine #2 hot section2,910 / 3,300h
APU4,120 / 6,000h
Nose gear overhaul1,910 / 3,000c

Category A open. Trip won't publish.

Most maintenance systems flag defects and hope someone reads the flag. FlightStratix enforces them. Category A MELs and overdue items are blocked at trip publish through the Feasibility Engine the same engine that runs crew FTL and aircraft availability checks.

Category A blocks dispatch the trip won't move to Scheduled until the defect is rectified or the deferral is legally valid.
Overdue MELs enforced too a Cat B item past 3 days is treated the same way as a live Cat A.
MEL history per aircraft preserved every deferral, every rectification, timestamped, audit-ready.
Notifications integrated expiries and MEL milestones surface on the same bell as document expiries and FTL warnings.
0
Cat A trips that can slip through
4
MEL categories tracked

Feasibility check · TS-2842

app.flightstratix.com/trips/TS-2842/feasibility
Pre-publish check
TS-2842 · KLAS → KASE
Crew FTL Capt. Vega, FO SinghClear
Aircraft availability N28FSClear
Document expiry insurance, AOCClear
CAMO Engine #1 hot section42h to due
MEL ATA 28-22 Cat AOpen
Trip cannot be published · MEL Cat A blocks dispatch

Three ways a maintenance spreadsheet ends the AOC.

Every operator running MX in Excel has had one of these conversations. Usually more.

MEL overrun

The Cat B was flown on day four.

The deferral clock started Monday. The trip flew Friday. Nobody watching the calendar spotted that day four had passed. The finding shows up on the next audit with the accountable manager's name against it.

Component overrun

The engine flew past its hot-section limit.

TAH tracked in a shared spreadsheet, updated at end of day. The Wednesday flight crossed the limit mid-block. Insurance company finds out at claim time. That's the worst possible time.

Scheduled miss

The A-check reminder never fired.

Calendar reminder set for the wrong month. The A-check due date passed. First anyone hears about it is when the ramp inspector asks to see the maintenance log. Trip cancelled. Broker calls someone else next time.

Run maintenance like the next audit is next week.

Book a 20-minute walkthrough on your fleet. See how TAH, TAC, MEL and CAMO warnings land on the same feasibility check as crew FTL.