Category A means grounded.

MEL tracking software that enforces the Minimum Equipment List. Categories A, B, C and D with auto-calculated rectification deadlines. Category A blocks dispatch through the Feasibility Engine the same one that runs crew FTL and CAMO warnings.

Categories A / B / C / D Auto-calculated deadlines Dispatch blocked on Cat A
app.flightstratix.com/fleet/N28FS/mel
MEL log · N28FS Citation X
3 open · 1 blocking
ATADescriptionCatDueStatus
28-22Fuel quantity indicator tank 2ANext flightOpen
21-51Pack valve position indicationC28 May 26Deferred
34-11Weather radar tilt indicatorD14 Sep 26Deferred
ATA 28-22 blocks dispatch · Category A, rectify before next flight
Trip blocked
TS-2842 · N28FS held
Feasibility engine · Cat A open
Rectified
ATA 21-51 · signed off 12 May
Aircraft cleared for dispatch

MEL tracking that enforces the rule.

Every MEL item, every category, every rectification deadline with dispatch enforcement built in.

Four categories

A, B, C and D with correct intervals

Category A: before next flight. B: 3 calendar days. C: 10. D: 120. The system tracks the clock; nobody memorises the rules.

RegulatoryICAO / EASA aligned
Auto-deadlines

Rectification deadlines calculated automatically

Enter the deferral and the category. The rectify-by date populates from the intervals no manual arithmetic, no calendar mistakes.

TriggerOn deferral entry
Dispatch blocking

Category A won't let the trip publish

Live Category A and overdue items are enforced through the Feasibility Engine at trip publish. It's a hard stop, not a soft warning.

EnforcedTrip publish
Feasibility integration

On the same check as FTL and CAMO

Every trip pre-check surfaces MEL alongside crew FTL, aircraft availability, document expiry and CAMO warnings. One panel. One decision.

Surfaced withFTL · CAMO · Docs
Notification bell

Every open item on the alert stream

Open MELs, approaching rectification dates and overdue items land on the notification bell alongside document expiry and FTL warnings.

Alert streamUnified
Audit history

Every deferral, every rectification, timestamped

Every state change on every MEL logged with user attribution and timestamp. Audit-ready log for CAA / FAA / GCAA inspection.

TrailFull audit

Four categories. Four different clocks.

A, B, C and D each have different rectification intervals. The system knows the difference and calculates the deadline the moment the defect is deferred. Deadlines land on the notification bell 3 days out for B, 7 days out for C, and 30 days out for D.

Category A: rectify before next flight always dispatch-blocking.
Category B: 3 calendar days blocks dispatch on day four.
Category C: 10 calendar days blocks dispatch on day eleven.
Category D: 120 calendar days blocks dispatch on day 121.
4
Categories tracked
0
Manual date arithmetic

MEL category matrix

app.flightstratix.com/settings/mel
Category rectification intervals
ICAO / EASA
A
Before next flightDispatch-blocking. No deferral tolerance.
0 days
B
3 calendar daysBlocks dispatch from day 4. Notified at 24h.
3 days
C
10 calendar daysBlocks dispatch from day 11. Notified at 7d.
10 days
D
120 calendar daysBlocks dispatch from day 121. Notified at 30d.
120 days

MEL runs on the same pre-check as FTL and CAMO.

Every trip publish runs a Feasibility check. Crew FTL, aircraft availability, document expiry, CAMO warnings and MEL all on one screen. If any of them fail, the trip can't publish. See maintenance tracking for the CAMO half of the check, and flight and duty tracking for the FTL half.

Combined check one API endpoint, one panel, one green-or-red verdict per crew and aircraft.
Trip can't publish until the blocking MEL is rectified or the deferral is legally valid.
MEL history preserved per aircraft the auditor sees the full trail, not just the current state.
Notification integration surfaces on the same bell as document expiry, FTL warnings and schedule conflicts.
1
Panel for the whole check
0
Cat A trips that slip through

Feasibility check · TS-2842

app.flightstratix.com/trips/TS-2842/feasibility
Pre-publish check
TS-2842 · KLAS → KASE
Crew FTL Capt. Vega, FO SinghClear
Aircraft availability N28FSClear
Document expiry insurance, AOCClear
CAMO Engine #1 hot section42h to due
MEL ATA 28-22 Cat AOpen
Trip cannot publish · MEL Cat A blocks dispatch

Three ways an MEL in Excel ends the AOC.

Every operator tracking MEL in a spreadsheet has had one of these mornings. Usually the day after it happens.

Category confused

The Cat A got treated as a Cat B.

Someone deferred an ATA 28 as Category B. It should have been A. The aircraft flew for three days with a legal-on-paper deferral that was illegal on the actual MEL. The inspector found it.

Deadline missed

Day four flew a Cat B.

The deferral clock started Monday. Friday flight. Nobody in the flight release chain remembered day 4 was Thursday. Overdue MEL. Regulatory finding. The accountable manager's name on the paperwork.

Log lost

The maintenance log is in seven places.

MELs tracked in the maintenance provider's spreadsheet. Deferrals emailed as PDFs. Rectifications noted in a WhatsApp. Audit day, the operator can't produce a coherent MEL history because there isn't one.

Enforce the MEL. Not the paperwork.

Book a 20-minute walkthrough on your fleet. See how MEL runs on the same feasibility check as crew FTL and CAMO.